An OEM client needed to scale their first two alpha systems and their end-user customer needed 10 systems delivered within eight months.
The system assembly and test documentation was incomplete. Additionally, there was limited floor space, technicians, supply chain, and infrastructure available for quick production scaling.
The client's systems were delivered to their customer within the eight-month timeframe as a result of three phases of work: